Energy Made Easy
Export tariff review

Outgoing Octopus Tariff

A flat 12p for every kilowatt-hour of solar electricity you send to the grid — nearly three times a typical Smart Export Guarantee rate, with nothing to schedule and no battery required. Who qualifies, how you're paid, what a real system earns, and when Outgoing Agile or Flux earns more.

Last Updated:
Rows of ground-mounted solar panels under a blue sky with clouds — generating the electricity Outgoing Octopus pays for

☀️What Outgoing Octopus Actually Is

12p/kWh
Flat export rate
Any time of day
~3×
A typical SEG rate
vs 4.1p/kWh
No
Battery needed
Built for solar-only homes

Outgoing Octopus is Octopus Energy's export tariff: the price it pays you for electricity your solar panels generate and don't use, which flows back into the grid. It pays a flat 12p per kilowatt-hour, the same at noon in June as at four o'clock on a December afternoon. The rate moved to 12p in March 2026, the first change since September 2022.

It sits above the Smart Export Guarantee — the government-mandated minimum that any supplier with 150,000 or more customers has to offer. Octopus's own SEG rate is 4.1p/kWh, and many suppliers' floor rates are in that region, so Outgoing pays close to three times as much for identical electrons. The catch is simple and worth saying plainly: you have to be an Octopus import customer to take it. Export tariffs are how suppliers reward households for bringing their import business, and Outgoing is priced accordingly.

It's one of five export options Octopus runs. The others — Outgoing Agile, Flux, Intelligent Flux and SEG — are compared in our export guide. Outgoing is the one to understand first, because it's the default answer for the most common setup: solar panels, no battery.

Eligibility: The Three Things You Need

Octopus as your import supplier
Outgoing is only offered alongside an Octopus import tariff. If you're with someone else, the route is to switch your import first — a few working days, no exit fee to leave Octopus later if it doesn't suit.
A smart meter that records export
A SMETS2 smart meter reads your export in half-hourly intervals, which is how Octopus bills it. If you have an older meter, Octopus fits a smart one free of charge; export readings start once it's commissioned.
An export MPAN and a certified installation
Your network operator assigns an export MPAN to a connection approved to feed electricity into the grid. Your installer normally arranges this. The system should be MCS-certified, as it must be for any export payment including SEG.

Notice what isn't on the list. No battery, no minimum system size, no particular inverter brand. Those constraints belong to Intelligent Flux, which needs compatible battery hardware to control. Outgoing is deliberately the plain option, and for most rooftop solar that's exactly right.

💷What It Actually Earns

Annual exportOutgoing Octopus (12p)Typical SEG (4.1p)Difference
1,000 kWh Small array, home during the day£120£4179
1,500 kWh 4kW system, typical£180£62118
2,000 kWh 4kW system, out all day£240£82158
3,000 kWh Larger array, low daytime use£360£123237

A 4kW system without a battery typically exports 1,000–1,500 kWh a year in the UK — how much depends mostly on whether anyone is home to use the generation as it happens. At 12p that's £120–£180, against £41–£62 on a 4.1p SEG rate. Not life-changing, but it's the same electricity, so leaving it on SEG is simply giving £80–£120 a year away.

Keep it in proportion, too. The larger financial return from solar is the import you avoid: every kWh you use yourself displaces a unit at the cap rate of 26.32p from October, more than double what export pays. That's why self-consumption comes first and export tariff second — but once you've arranged your usage, the export tariff is a free choice, and the right one pays three times the wrong one. Our savings calculator puts the Outgoing income alongside your import bill.

⚖️Outgoing vs Outgoing Agile, Flux and SEG

TariffExport rateBatteryBest for
Outgoing Octopus12p/kWh flatNot neededSolar without a battery — simple, predictable
Outgoing AgileHalf-hourly, ~9.4p average, 20–40p at peakRecommendedBattery owners exporting into the evening peak
Octopus FluxVariable, three daily bands (import + export)YesSolar + battery with manual control
Intelligent Octopus FluxMatched import/export, automatedYes, compatible brandsSolar + battery, fully hands-off
SEG (Octopus)4.1p/kWh flatNot neededAnyone whose import is with another supplier

The decision hinges on one question: can you choose when you export? Solar panels can't — they export when the sun is out, which is when the grid needs electricity least and Agile export rates are ordinary. A flat 12p beats an average of 9.4p for electricity you have no control over. A battery changes the answer entirely: hold the day's generation and release it between four and seven on a weekday evening at 20–40p, and Outgoing Agile or Flux earns considerably more than 12p ever can.

SEG is the fallback rather than a competitor. If your import is with another supplier and you don't want to move it, Octopus's 4.1p SEG rate is available to you — but you'd be taking a third of the money for the same electricity to avoid a five-minute switch that also pays £50.

🔗Pairing Outgoing with an Import Tariff

Outgoing is an export tariff only; you still choose an import tariff for the electricity you buy. It pairs with Flexible, Fixed, Tracker, Agile, Go and Intelligent Octopus Go. For a solar home with an EV, Intelligent Go on import and Outgoing on export is a common and sensible combination: cheap overnight charging in, 12p for the daytime surplus out.

Flux and Intelligent Flux are the exception. They are combined tariffs that set both your import and export prices, so you would be on Flux rather than Flux plus Outgoing. Which pairing earns most depends on your battery and your habits; the solar and battery guide works through the cases. And because there are no exit fees on any Octopus tariff, import or export, getting it wrong costs nothing but the time to change it.

📱How to Get Outgoing Octopus

Step 1
If Octopus isn't your import supplier, switch through our referral link. About five minutes; the £50 credit is applied when the switch completes a few working days later.
Step 2
Check your meter. If it's not a SMETS2 smart meter, book a free installation from your account. Export can't be paid until the meter is recording it.
Step 3
Have your export MPAN and MCS certificate to hand — your installer supplies both. Octopus asks for them when you apply for an export tariff.
Step 4
Apply for Outgoing from your account or the app. Once it's live, export appears as its own line on your statement, credited against your import charges.
Step 5
Revisit when your setup changes. Add a battery and Outgoing Agile or Flux may earn more; get an EV and Intelligent Go becomes the obvious import pairing. No exit fees either way.

The full switching timeline is in how switching works, and the smart meter guide covers what to expect from an installation visit.

Verdict — The Right Default for Solar Without a Battery

Verdict: If you have solar and no battery, Outgoing Octopus is the export tariff to be on. Nearly three times SEG, nothing to manage.

Twelve pence flat for electricity you can't time is a better deal than an Agile average of 9.4p, and roughly three times a 4.1p SEG rate. The only requirement that costs anything is being an Octopus import customer, and that requirement pays you £50 to meet it. Add a battery later and the conversation moves to Outgoing Agile or Flux; until then, this is the answer.

Octopus Energy supplies 7.3 million UK households, has been Which? Recommended for 9 consecutive years and holds a 4.8/5 Trustpilot rating from 800,000+ reviews. Switch via our referral link and £50 free credit lands in your account. Then compare all five export tariffs or see every Octopus tariff for the import side.

Sources: Ofgem — energy price cap. Figures last checked September 2026.

Got questions?

Outgoing Octopus FAQ

A flat 12p per kWh for every unit of electricity you export to the grid, at any time of day. The rate moved to 12p in March 2026, the first change since September 2022. Against a typical Smart Export Guarantee rate of around 4.1p/kWh, it's close to three times as much for the same electricity.

Ready to save £50 on your energy?

Outgoing Octopus needs Octopus as your import supplier. Switch through our referral link, collect £50 credit, then add Outgoing from your account — no exit fees on anything.

Switch to Octopus — Unlock Outgoing